banner

Products

HS6

HS6

Introduce Chemical composition % of steel HS6-5-3-8 (1.3244): EN 4957-2000 Description high speed tool steel with high c
SHARE

Description

Basic Info.
Model NO. HS6-5-3-8, 1.3244
Application Cold Heading Steel
Transport Package Standard Sea Packing
Specification Customize
Origin China
HS Code 7228300000
Production Capacity 5000ton/Month
Product Description

Introduce

Grade :HS6-5-3-8
Number:1.3244
Classification:High-speed tool steel
Standard:EN ISO 4957: 2000 Tool steels

Chemical composition % of steel HS6-5-3-8 (1.3244): EN 4957-2000

CSiMnPSCrMoWVCo
1.23 - 1.33max 0.7max 0.4max 0.03max 0.033.8 - 4.54.7 - 5.35.9 - 6.72.7 - 3.28 - 8.8

Description

high speed tool steel with high cobalt, produced by gas atomization, hot isostatic pressing and plastic deformation.

Very high resistance to wear and to softening.

High compression strength.

Deep hardening response and much better toughness than conventional high speed tool steel.

Very good dimensional stability at hardening.

Applications

End mills, milling cutters, broach needles, cutting and punching, tools, dies, working rolls for cluster rolling stand.

Physical properties (average values) at ambient temperature

Density [g/cm3]: 8.08

Stress Relieving

Stress relieving to remove machining stresses should be carried out by heating to 650oC, holding for one hour at heat, followed by air cooling. This operation is performed to reduce distortion during heat treatment.

Advanced machine production Exquisite workmanship Accurate thickness Ctrict testing Our rich product line High - quality products Perfect service and management system Provide multiple guarantee for your needs
FAQ
1. How can I get a quotation from you ?You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.And you can also find our contact information on contact page.2.Can I get samples before order ?Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings. We can build the molds andfixtures.3. what is your delivery time ?The time of delivery is usually around 1 month(1*40FT as usual).We can send out in 2 days, if it has stock.4.What is your payment terms?Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.5. How can you garantee what I got will be good ?We are factory with 100% predelivery inspection which garantee the quality.6 How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;2. We respect every customer as our friend and we sincerely do business and make friends with them

Our Contact